Views: 0 Author: Site Editor Publish Time: 2021-06-02 Origin: Site
1) Before use, thoroughly check the scaffold that has been built to ensure that all assembly instructions are followed and that the parts of the scaffold are not damaged.
2) Only climb the scaffold when the scaffold has been leveled and all casters and adjusting legs have been fixed.
3) Do not move or adjust the scaffold when there are people or objects on the platform.
4) It can climb into the platform from the internal ladder of the scaffold, or climb into the ladder building ladder, or enter the working platform through the aisle of the frame, or enter the working platform through the opening of the platform.
5) If a vertical extension device is added to the base part, it must be fixed on the scaffold using an external support or a broadening tool.
6) When the platform height exceeds 1.20m, safety guardrail must be used.
7) Install and lock the tension reinforcement on the scaffold according to the instructions to enhance its stability.
8) When setting up, the brake of the wheel foot must be brake, and the level must be adjusted well.
9) The bayonet at the connection should ensure that the connection is stable.
10) ladders, platform boards and opening boards must be hooked well to hear the clicking sound.
11) When the platform plate of single-width scaffold exceeds 4m, and the platform plate height of double-width scaffold exceeds 6rn, external support plate must be used.
12) The vertical rod of the external support connection must be tightened, not loose, the lower end cannot be suspended, and the lower end should be close to the ground.
13) A horizontal support rod shall be used for every two oblique support rods.
14) The nut of the connecting buckle must be tightened, and the vertical rod and strengthening rod must be firmly stuck.
15) When the platform height is L5m, the reinforcing rod must be used.
16) When moving, the brake of the wheel foot shall be loosened, the lower end of the outer support shall be off the ground, and it is strictly prohibited to move when there are people on the scaffold.
17) It is strictly prohibited to use tools with strong impact.
18) Scaffolding is strictly prohibited to be used in strong winds and overload is strictly prohibited.
19) Scaffolding can only be used on solid ground (flat hard ground, concrete ground), etc. It is strictly prohibited to use on soft ground!
20) All operators must wear safety helmets and fasten safety belts when erecting, disassembling and using scaffolding.
The DragonStage 8x6x3m Aluminum Lighting Truss System is a freestanding rectangular lighting grid designed for concerts, exhibitions, ceremonies, corporate events, and temporary productions. The system provides an 8m wide × 6m deep × 3m high overhead truss area supported by four ground-support towers, creating multiple positions for stage lighting and event equipment
The DragonStage 3x3m Aluminum Goal Post Truss is a freestanding modular truss structure designed for sports events, entrances, branding, banners, lighting, and temporary event displays. The structure measures 3m wide × 3m high, with a 2.5m deep base frame extending along the ground on both sides.
The DragonStage 4x4m Ringlock FOH Platform / VIP Viewing Platform is a modular elevated structure for front-of-house control use or temporary VIP viewing use. The main platform is 4m wide and 4m deep, with a 1.5m platform height and a total structure height of 4.5m. A side 2m small platform with stair access makes entry safer and more practical for event operations
The DragonStage 12x4x8m Ringlock LED Screen and Line Array Hanging Structure is a double-row temporary event support system designed for hanging both LED screens and line array speakers. The overall structure is 12m wide, 4m deep, and 8m high, with a front row height of 8m and a rear row height of 4m. The top is equipped with 6 top section trusses for LED screen and speaker suspension.
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997