| Availability: | |
|---|---|
Dragonstage
Material: Crafted from robust, high-corrosion-resistance aluminum alloy 6082-T6.
Structure: A comprehensive ground support and box truss system, ideal for hanging heavy production equipment like lighting arrays, large format speakers, and LED display panels.
Versatility: The modular design ensures quick installation and breakdown, making it suitable for high-frequency usage at concerts, festivals, trade shows, and corporate events.
Durability: Built to withstand various outdoor conditions while maintaining structural integrity and safety standards.

packing weight:2250kg
packing volume:36cbm
| Item | Specification(squre truss) | Qty | ||||||
| length | main tube(mm) | size(mm) | ||||||
| 15.00 m Beam(front) | 4 sets | 3.00 m | 50×4.0 | CS520×760 | 20pcs | |||
| 2.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 1.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 12.00 m Beam(side) | 2 sets | 3.00 m | 50×4.0 | CS520×760 | 8pcs | |||
| 2.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 1.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 6.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS389×389 | 8pcs | |||
| 2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
| 1.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
| beam cube | 6 faces | CS520×760 | 4pcs | |||||
| Frame Tower | Spigot Sleeve Block L | 4pcs | ||||||
| Steel Base L | 4pcs | |||||||
| Top Section L | 4pcs | |||||||
| Manual hoist,BA05 2Tons | 4pcs | |||||||
| Spigot Hinge Section,Height 1m | 4pcs | |||||||
| Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
| Long outrigger | 16pcs | |||||||
Material: Crafted from robust, high-corrosion-resistance aluminum alloy 6082-T6.
Structure: A comprehensive ground support and box truss system, ideal for hanging heavy production equipment like lighting arrays, large format speakers, and LED display panels.
Versatility: The modular design ensures quick installation and breakdown, making it suitable for high-frequency usage at concerts, festivals, trade shows, and corporate events.
Durability: Built to withstand various outdoor conditions while maintaining structural integrity and safety standards.

packing weight:2250kg
packing volume:36cbm
| Item | Specification(squre truss) | Qty | ||||||
| length | main tube(mm) | size(mm) | ||||||
| 15.00 m Beam(front) | 4 sets | 3.00 m | 50×4.0 | CS520×760 | 20pcs | |||
| 2.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 1.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 12.00 m Beam(side) | 2 sets | 3.00 m | 50×4.0 | CS520×760 | 8pcs | |||
| 2.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 1.00 m | 50×4.0 | CS520×760 | 0pcs | |||||
| 6.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS389×389 | 8pcs | |||
| 2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
| 1.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
| beam cube | 6 faces | CS520×760 | 4pcs | |||||
| Frame Tower | Spigot Sleeve Block L | 4pcs | ||||||
| Steel Base L | 4pcs | |||||||
| Top Section L | 4pcs | |||||||
| Manual hoist,BA05 2Tons | 4pcs | |||||||
| Spigot Hinge Section,Height 1m | 4pcs | |||||||
| Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
| Long outrigger | 16pcs | |||||||
The Multifaceted Role of Totem Truss in Modern Event Design: A Case Study in Exhibition Gateways
The Marvel of Aluminum and Why Aluminum Trusses Are Remarkable
Best Practices for Proper Handling and Maintenance of Aluminum Trusses
Casting Brilliance: Mastering Lighting Truss Layout for Stunning Visuals
Behind the Scenes: Exploring Lighting Trusses and Studio Setup
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997
