packing weight:1470kg
packing volume:11cbm
| Item | Specification(squre truss) | Qty | ||||||
| length | main tube(mm) | size(mm) | ||||||
| 8.00 m Beam(front) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
| 2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
| 1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
| 11.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 6pcs | |||
| 2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
| 1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
| 5.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
| 2.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
| 1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
| beam cube | 6 faces | CS289×289 | 0pcs | |||||
| Frame Tower | Spigot Sleeve Block S | 4pcs | ||||||
| Steel Base S | 4pcs | |||||||
| Top Section S | 4pcs | |||||||
| Manual hoist,BA05 2Tons | 4pcs | |||||||
| Spigot Hinge Section,Height 1m | 4pcs | |||||||
| Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
| Long outrigger | 16pcs | |||||||
| Item | Specification(squre truss) | Qty | ||||||
| length | main tube(mm) | size(mm) | ||||||
| Roof Pillar | 2 sets | .80 m | 50×3.0 | CS289×289 | 2pcs | |||
| 11.00 m Top Beam | 1 sets | 3.00 m | 50×3.0 | CS289×289 | 3pcs | |||
| 2.00 m | 50×3.0 | CS289×289 | 1pcs | |||||
| 1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
| 4.20 m Oblique Beam | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
| 2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
| 1.20 m | 50×3.0 | CS289×289 | 4pcs | |||||
| 4.20 m Ladder truss | 10 sets | 3.00 m | 50×3.0 | CL30,289*50 | 10pcs | |||
| 2.00 m | 50×3.0 | CL30,289*50 | 0pcs | |||||
| 1.20 m | 50×3.0 | CL30,289*50 | 10pcs | |||||
| Roof Components | 4 | roof conner 4 ways, use for roof beam truss | CS289×289 | 2pcs | ||||
| 5 | roof conner 5 ways, use for roof beam truss | CS289×289 | 0pcs | |||||
| 1 | Connect plate with clamp | CS289×289 | 2pcs | |||||
| Single clamp | 20pcs | |||||||
| Double clamp | 8pcs | |||||||
| roof canopy material:pvc, Blue Colour or customized. | 157.36 | 1pcs | ||||||
Premium Material: Constructed from high-strength Aluminum Alloy, ensuring a lightweight yet incredibly robust structure that is resistant to corrosion.
Optimized Dimensions: With a spacious 11m length, 8m depth, and 6m peak height, this stage provides ample room for performers and complex equipment setups.
Saddle Roof Design: The curved roof profile not only looks modern but is specifically designed to handle outdoor weather conditions by preventing water pooling.
Easy Assembly: Designed for portability, the bolt/spigot connection system allows for efficient setup and teardown, making it ideal for touring and mobile event companies.
Versatile Application: The perfect solution for outdoor festivals, corporate events, wedding ceremonies, and mid-sized concert productions.
Structure: Aluminum Alloy Truss
Roof Style: Saddle Roof
Length: 11 Meters
Depth: 8 Meters
Height: 6 Meters
Load Capacity: High-strength rating for heavy lighting and sound arrays.
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997