Mobile Scaffolding Operating Platform Construction and Disassembly Specification


1. You should check if all materials meet the requirements before it is included.


2. Demolition of the mobile operating platform must be borne by the shelf worn by safety education, where there is high blood pressure, heart disease must not operate.


3. Take, split workers must not drink, do not joke during the demolition process.


4. Take it, the demolition is wearing the imperial, prohibiting wearing hard shoe, high heels, plastic shoes and belling shoes.


5. Before construction, safety technology should be submitted step by step, implement all safety technical measures and personal protective supplies, and may not be taken, remove the construction. 6. During the process, the steel pipe is not allowed to touch the electric line.


7. When there is a defect and hidden dangers in the construction, it must be resolved in time.


8. When you set up a mobile operating platform, strictly control the construction load.


9. Due to the necessary temporary or change safety protection facilities, it is necessary to consent, and the corresponding reliability will be recovered immediately after the operation.


10. When the operator worker on the mobile operation platform must wear a hard hat, a seat belt (connection platform guard), wearing anti-skating shoes.


11. Special person should be set up to perform the scaffolding, find problems in time, correct, avoid large


The occurrence of an accident.


12. While equipped with a scaffolding, you must set up the escalator, which is strictly prohibited to climb on the scaffold.


13. EtOAc. You must set up a special perspective to enter the work area.


14. It is strictly forbidden to throw the disassembled material and the rod member. Extunction materials that have been hang to the ground should be shipped from the disassembly area and have a collision of the code to maintain the civilization.