packing weight: 1650kg
packing volume: 5cbm
| Item | Specification | Quantity | |||
| steel assembly stage | topping: 4x8ft (1.22x2.44m) | wooden | 20 pcs | ||
| LR01,pillar and inner tube | L= | 1.00m | 30 pcs | ||
| LR02,horizontal pipe,length:8ft | 48 pcs | ||||
| LR02,horizontal pipe,length:4ft | 50 pcs | ||||
| Fork | 30 pcs | ||||
| clamp | 24 pcs | ||||
| Stage adjustable base | 30 pcs | ||||
| Stage Stair | wooden topping | total | 4 | steps | 2 pcs |
Tackling the Bending Issue of Ringlock Rod: Ensuring Structural Stability and Safety
What are the load-bearing capabilities of steel Ringlock trusses and how are they tested?
How do steel Ringlock trusses compare in terms of cost and efficiency to other types of trusses?
What are some common applications for steel Ringlock trusses in construction projects?
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997