packing weight: 100kg
packing volume: 1cbm
| 3 rungs frame (W*H:0.75*1.386m) | | 1pcs |
| 3 rungs frame with ladder (W*H:0.75*1.386m) | | 1pcs |
| Diagonal Bar SD1 | | 2pcs |
| Horizontal Bar SD2 | 6pcs | |
| 6inch wheel and adjustable leg | | 4pcs |
| Trop door platform SD7 | | 1pc |
| Toe board SD7 | | 1pc |
| Guardrail SD9 | | 2pcs |
| Long outrigger-3m(supporter) | | 4sets |
packing weight: 70kg
packing volume: 0.5cbm
| 3 rungs frame (W*H:0.75*1.386m) | | 1pcs |
| 3 rungs frame with ladder (W*H:0.75*1.386m) | | 1pcs |
| Diagonal Bar SD1 | | 2pcs |
| Horizontal Bar SD2 | 2pcs | |
| 6inch wheel and adjustable leg | | 4pcs |
| Trop door platform SD7 | | 1pc |
Safety Precautions for Working on Aluminum Mobile Scaffolding
How to Assemble and Disassemble Aluminum Mobile Scaffolding Safely
Why Aluminum Mobile Scaffolding Is Popular for Maintenance Work
What Is Aluminum Mobile Scaffolding? Components, Advantages and Applications
What are the safety requirements for using aluminum scaffolding?
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997